High Street, Green Street Green, BR6 (Bromley Council)

Project Details

We were approached to design a New Build development to replace the existing offices which was unoccupied and had been for some time, and provide in it’s place much needed additional family dwellings. The design approach was a completely new concept to that which was already existing. The architecture of the new build design would have to be in keeping with the local architecture however, over come over looking issues as will as the constraints that come with a confined site. Nonetheless, our design allowed for two high end family residential dwellings to be built within walking distance to Green street green high street & local amenities. The proposal was a planning success and is due for completion in Sept’17.

Why Consider A New Build?

New Builds are an exciting opportunity to start a fresh and observe the entire design process from conception to practical completion. There are several factors which must be considered when designing a new build, particularly the scale, orientation as well as the materiality of the project. All of these factors and many more can be discussed together, with us in your first FREE initial consultation.

Are you considering a NEW BUILD? If so, we can advise you! Call Us Now! 020 8123 9086 or email our studio: info@forwardarchitecture.co.uk